MENU
-
-
-
LIST WITH US
-
-
CONTACT
- 36,318sqm of high clearance warehouse/offices
- Total land area of 60,728sqm
- All weather super awning 41m for loading
- Multiple on grade roller shutters and recessed docks
- Very versatile and flexible designs available
This new warehouse complex will be ready for occupation in 2024. Features include LED Lighting, dedicated solar system, recessed docks with load levellers and secure container rated hardstand.
Located in the popular fast growing Crestmead Industrial hub, this property offers easy access to the Mount Lindesay Highway, Logan and Gateway Motorways.
3-Phase Power
All Weather Awning
B-Double Access
Hardstand
LED Lighting
Loading Dock/s